IAHR, founded in 1935, is a worldwide independent member-based organisation of engineers and water specialists working in fields related to the hydro-environmental sciences and their practical application. Activities range from river and maritime hydraulics to water resources development and eco-hydraulics, through to ice engineering, hydroinformatics, and hydraulic machinery.
Log On
About IAHRDirectoryCommitteesMy IAHRNews & JournalseLibraryeShopEventsJoin IAHRWorld CongressDonate
spacer.gif
spacer.gif eLibrary
spacer.gif eLibrary
You are here : eLibrary : IAHR World Congress Proceedings : 36th Congress - The Hague (2015) ALL CONTENT : Flood risk management and adaptation : A probabilistic optimisation methodology for flood risk management in the scheldt and lys basin
A probabilistic optimisation methodology for flood risk management in the scheldt and lys basin
Author : JORIS BLANCKAERT(1), CEDRIC GULLENTOPS(1), TIM FRANKEN(1), FERNANDO PEREIRA(2) & JAN SWINGS(1)
ABSTRACT
In response to the European Flood Directive a flood risk management plan (FRMP) is being prepared for the Ghent canals
and the Belgian part of the Upper Scheldt and the Leie/Lys basins (ca. 10.000 km2 drainage area in total) using a full
probabilistic risk approach. According to the Directive FRMP¡¯s should focus on preparedness, prevention and
protection, considering climate change (CC) and land use change (LUC) impacts. In this study a methodology is presented
which allows for selecting an optimal combination of flood risk mitigation measures according to economic and societal
criteria, i.e. the net present value (NPV) and people at risk (P@R).
Risk analysis requires considering the entire frequency domain of flood consequences. Hence statistical extrapolation is
necessary. This is done by generating 2500 synthetic extreme events for the different catchments, taking into account
joint occurrences by means of an extreme value copula. After simulation with the hydrodynamic flood model, empirical
frequency distributions are drawn for flood depths in the floodplains. As a validation, these distributions are plotted against
historical events, displaying good similarity. At this point, flood risk maps could be drawn, while CC and LUC are taken
into account by future projections for the year 2050, through perturbed rainfall and evaporation series and urban
development scenario¡¯s.
Protection measures include different river channel widening configurations, levee increase, dike displacement, local
protection walls and pump stations. Prevention measures include resilience and retreat measures for buildings, and
preparedness measures include an early flood warning system. In order to detect the optimal scenario, any possible
combination of protection, prevention and preparedness measures is considered. This yields over 1.000 possible FRMP¡¯s,
being evaluated by means of the hydraulic model and a GIS loss model. Each scenario produces a benefit, defined as a
decrease of monetary and societal risk. At the same time construction, operational and maintenance costs for each
combination are assessed. Considering a lifetime of 40 years, NPV and P@R are calculated for any individual scenario.
Eventually a bivariate Pareto front is obtained, allowing to select an optimised FRMP according to economic and societal
criteria.
File Size : 3,739,419 bytes
File Type : Adobe Acrobat Document
Chapter : IAHR World Congress Proceedings
Category : 36th Congress - The Hague (2015) ALL CONTENT
Article : Flood risk management and adaptation
Date Published : 13/08/2015
Download Now