IAHR, founded in 1935, is a worldwide independent member-based organisation of engineers and water specialists working in fields related to the hydro-environmental sciences and their practical application. Activities range from river and maritime hydraulics to water resources development and eco-hydraulics, through to ice engineering, hydroinformatics, and hydraulic machinery.
Log On
About IAHRDirectoryCommitteesMy IAHRNews & JournalseLibraryeShopEventsJoin IAHRWorld CongressDonate
spacer.gif
spacer.gif eLibrary
spacer.gif eLibrary
You are here : eLibrary : IAHR World Congress Proceedings : 36th Congress - The Hague (2015) ALL CONTENT : Special sessions : An approach for full scale off-line testing to evaluate the iwidget system performance
An approach for full scale off-line testing to evaluate the iwidget system performance
Author : PAULA VIEIRA1, JOSÉ BARATEIRO2, DÁLIA LOUREIRO3, JOÃO COELHO4, AISHA MAMADE5
oing European Commission FP7 project aiming at improved water efficiencies using novel ICT technologies for integrated supply-demand side management, focusing on an integrated approach to water resources management. The project contributes to advance knowledge about smart metering in order to develop novel, robust and cost-effective ICT tools for both water utilities and consumers. Within the project, a set of relevant applications derived from smart metering real-time data was identified, characterized and implemented in a software prototype. This prototype is a critical asset that must be evaluated to ensure its compliance with the requirements specified during system analysis and design and to verify its acceptance according to the end users’ needs. The prototype evaluation followed the software engineering best practices, through a set of software tests with close collaboration between consumers, utility stakeholders and software developers. Once individual components (data management and analytical) have passed unit testing, integrated tests took place. The first phase of integrated tests used off-line historical smart metering data as opposed to the second phase (on-line testing) that uses near real-time data. This paper presents the standardized method designed in the project to carry out the off-line testing. The off-line testing method is based on a test scenario/test case approach and includes functional (i.e., tests to verify if functional requirements are met) and non-functional testing (i.e., tests to verify the quality of the software in terms of usability, security or compatibility, for example). For each evaluated application, test scenarios were designed as well as the corresponding test cases (in total, more than 50 test scenarios and 90 test cases). Success criteria for determining whether an observed behaviour of the system is correct and key performance indicators (KPI) to assess the achievement of success criteria were also defined for each test case step. This paper also presents results of the method´s application, which included collecting historical data from a full-scale case study, feeding this data to the prototype, analysing the results and evaluating KPI in order to identify corrections and improvements.Form Required :
File Size : 921,249 bytes
File Type : Adobe Acrobat Document
Chapter : IAHR World Congress Proceedings
Category : 36th Congress - The Hague (2015) ALL CONTENT
Article : Special sessions
Date Published : 19/08/2015
Download Now