IAHR, founded in 1935, is a worldwide independent member-based organisation of engineers and water specialists working in fields related to the hydro-environmental sciences and their practical application. Activities range from river and maritime hydraulics to water resources development and eco-hydraulics, through to ice engineering, hydroinformatics, and hydraulic machinery.
Log On
About IAHRDirectoryCommitteesMy IAHRNews & JournalseLibraryeShopEventsJoin IAHRWorld CongressDonate
spacer.gif
spacer.gif eLibrary
spacer.gif eLibrary
You are here : eLibrary : IAHR World Congress Proceedings : 36th Congress - The Hague (2015) FULL PAPERS : THEME 6- WATER RESOURCES AND HYDROINFORMATICS : DECISION MAKING UNDER UNCERTAINTY FOR RISK MANAGEMENT OF WATER SUPPLY PROJECTS
DECISION MAKING UNDER UNCERTAINTY FOR RISK MANAGEMENT OF WATER SUPPLY PROJECTS
Author : ABBAS ROOZBAHANI
Safekeeping of drinking water supply systems needs risk mitigation options to decrease the vulnerability against natural and manmade events which threaten the normal operation of these systems in meeting the water demands. Improper selection and implementation the best option leads to increasing the water projects economic and social costs. For proper decision making about possible risk reduction measures, an effective decision support tool is required with ability of considering the different uncertainties related to input data such as criteria values and weights, risk assessment procedure and decision makers with different idea and objectives. In this paper a hybrid decision making model has been presented to rank the risk management scenarios in field of water supply infrastructures regarding the different effective criteria and ranking methods in a group decision making space. To deal with the mentioned uncertainties and reliable decision making, a probabilistic based model of Monte Carlo Simulation (MCS) has been combined with two multi criteria decision making methods (MCDM) of PROMETHEE and TOPSIS to map a stochastic problem to so many deterministic problems. A case study in Iran has been utilized to show the capabilities of the presented model for prioritizing the urban water supply projects.
File Size : 480,750 bytes
File Type : Adobe Acrobat Document
Chapter : IAHR World Congress Proceedings
Category : 36th Congress - The Hague (2015) FULL PAPERS
Article : THEME 6- WATER RESOURCES AND HYDROINFORMATICS
Date Published : 20/04/2016
Download Now