IAHR, founded in 1935, is a worldwide independent member-based organisation of engineers and water specialists working in fields related to the hydro-environmental sciences and their practical application. Activities range from river and maritime hydraulics to water resources development and eco-hydraulics, through to ice engineering, hydroinformatics, and hydraulic machinery.
Log On
About IAHRDirectoryCommitteesMy IAHRNews & JournalseLibraryeShopEventsJoin IAHRWorld CongressDonate
spacer.gif
spacer.gif eLibrary
spacer.gif eLibrary
You are here : eLibrary : Ice Research and Engineering : 22nd Symposium_Singapore (2014) : THEME 2- RIVER, LAKE AND RESERVOIR ICE : ICE PROCESS IN CHANNEL BENDS OF THE INNER MONGOLIA REACH OF YELLOW RIVER
ICE PROCESS IN CHANNEL BENDS OF THE INNER MONGOLIA REACH OF YELLOW RIVER
Author : Li Chao, Li Changyou, Li Hongfang, Ji Honglan, Shi Xiaohong
Ice jams usually occurs at the river bends of the Inner Mongolia Reach of Yellow River in the freeze up period. In this paper, based on the field observation of freeze up in the 2013-2014 winter and the simulation of water flow in the Sanhuhekou bend, the freeze up process and characteristics were analyzed. The analysis showed the ice bridging started at the narrow position of river bend. Ice cover will develop to the upstream from there. Due to the cut off of the ice supply, open water can form at the downstream of river bend. The water velocities will redistribution after the freeze up to cause the bed morphology change. At the same time, the
File Size : 2,820,076 bytes
File Type : Adobe Acrobat Document
Chapter : Ice Research and Engineering
Category : 22nd Symposium_Singapore (2014)
Article : THEME 2- RIVER, LAKE AND RESERVOIR ICE
Date Published : 13/07/2016
Download Now