DONATE

IAHR Document Library


« Back to Library Homepage « Proceedings of the 27th IAHR World Congress (San Francisco, ...

Folsom Spillw Ay Gate Failure and Lessons Learned

Author(s): Robert V. Todd

Linked Author(s):

Keywords: No Keywords

Abstract: Spillway Tainter (radial), gate No. 3 failed at Folsom Dam, California, on July 17, 1995, in the early morning. The failure resulted in a discharge of 1,132 m^3/s into the lower American River. This paper will address how the forensic team formed to investigate this failure functioned, and arrived at a failure theory.

DOI:

Year: 1997

Copyright © 2024 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions