DONATE

IAHR Document Library


« Back to Library Homepage « Proceedings of the 22nd IAHR World Congress (Lausanne, 1987)...

Some Computational Aspects of USBR's Gstars Model

Author(s): Charles C. S. Song; Yifan Zen; Chih Ted Yang

Linked Author(s): Chih Ted Yang

Keywords: No Keywords

Abstract: The U. S. Bureau of Reclamation's GSTARS (Generalized Stream Tube Model for Alluvial River Simulation) computer model was tested using the unpaved spillway of Willow Creek Dam as a test case. Computational aspects of this model include testing the stability, accuracy, and efficiency of the model.

DOI:

Year: 1987

Copyright © 2025 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions