In Situ Performance Curves Measurements of Large Pumps

Author(s): A Anton

Linked Author(s):

Keywords: No keywords

Abstract: The complex energetic system on the river Lotru in Romania comprises of a series of lakes and pumping stations and a major hydroelectric power plant: Lotru-Ciunget. All the efforts have been oriented towards the maintenance of the Pelton turbines and very little attention has been directed to the pumps. In the system, there are three large pumping stations and only in the last 5 years, the pump performances have become a concern. The performances where determined using portable ultrasonic flow meters, a Yates meter, precision manometers and appropriate electrical equipment for power measurement (Power Analiser – NORMA D4000 LEM). The measurements are not supposed to interfere with the normal operation so only a limited number of tests could be performed. Based on those tests, portions of the test curves have been measured and represented in specific diagrams.

DOI: https://doi.org/10.1088/1755-1315/12/1/012090

Year: 2010

Copyright © 2026 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions